: Project : Client : Location : Scope : |
2021 Yala - Wte 3 MW PP (Waste to Electricity) Yala Far Saard Yala Thailand Owner Engineering Service for Wte Power Plant 3 MW A) Project Management 1) Provision of Project Schedule 2) Project Schedule Control 3) Construction Permit Advisor 4) Coordinate with lender advisor B) Pre Engineering Phase 1) Provision of Preliminary Overall Layout 2) Review Vendor Technology 3) Provision of Preliminary Engineering 4) Advise Owner to carry out basic information C) Engineering Phase 1) Reviewed EPC Contractor Design Drawings 2) Reviewed EPC Contractor Calculation (Process/ Mechanical/ Electrical) 3) Reviewed Material/ Equipment Specification 4) Detailed Design for OSBL Building and Facilities D) Construction Phase 1) Tracking and Expedite Material Delivery 2) Construction Progress Expediting |